04
Logistics contract negotiation and governance
We structure and lead the negotiation of transport, terminal and warehousing contracts on the shipper’s side, with the real cost rebuilt and the alternatives quantified before the first meeting.
Context
The result of a logistics negotiation is largely set before the first meeting. The preparation consists of rebuilding the real cost of the operation, mapping the alternatives available and turning each of them into a number the counterparty has to answer.
The most common mistake we see is to arrive with a request for a discount, which is easy to refuse. A counterparty responds differently when shown that an alternative route has a lower total cost, that service indicators can be measured against the contract, or that committed volumes can be aligned with the real profile of the operation.
Much of the value lies in contract design. Term, performance indicators, measurement criteria, review triggers and flexibility mechanisms determine the effective cost of a multi-year contract far more than the rate signed on day one.
Scope of work
Real cost reconstruction
Invoices decomposed into base freight, accessorials, storage and penalties, with an audit trail to source documents.
Quantified alternatives map
Door-to-door modelling of every viable route, port and mode, with total cost compared. An alternative only counts in a negotiation once it has a number.
Contract architecture
Proposed structure: price bands, tolerance ranges, performance indicators, measurement criteria and review triggers.
Negotiation leadership
Direct participation in rounds, with scenario preparation, definition of the zone of agreement and sequencing of concessions.
Post-signature governance
Baseline protocol, indicator tracking routine and periodic committee, so that the agreement survives turnover on both sides.
Discuss my case
Signals this applies to you
When three or more of these describe your operation, we usually find enough value to justify a diagnostic.
Discuss my case- A material contract entering renegotiation in the next 18 months.
- Rates unchanged for years except for index adjustments.
- A contracted service level with no objective indicator or measurement criterion.
- Volume commitments that have not been reviewed against real volume variation.
FAQ
Frequently asked questions
Do you replace the internal procurement team?
No. We work with the internal team, which keeps the relationship and the decision. We add the technical thesis, the modelling of alternatives and experience at the table in large logistics contracts.
How is the fee calculated?
On validated savings, in tiers according to value captured. Mobilisation is reimbursable and deducted from the success fee. Recurring contracted savings carry a tail for a defined period.
What if the negotiation produces no saving?
Under a success model, no validated saving means no success fee. For that reason the work starts with a diagnostic, and we recommend proceeding only when a clear financial thesis exists.
Related practices
Logistics network optimization and service level
We model the network formally to answer where to produce, where to hold inventory, how to route and at what service level. The solution carries a mathematical guarantee of optimality, which a spreadsheet heuristic cannot give.
02Tax-balanced network design
We optimize the network and the tax structure inside the same model. In Brazilian interstate operations, a decision on where to hold inventory that leaves ICMS out is taken with half the information.
03Operating cost efficiency across the chain
We target the costs that accumulate outside base freight (demurrage, detention, storage, handling and accessorials), with documented recalculation and correction of the root cause.
Next step
Put a number on the recoverable value in your operation
The first step is a 30-minute conversation about your corridor, your contracts and the order of magnitude involved. There is no pitch deck and no commitment.