S&OP and S&OE: integrated sales and operations planning
We implement the S&OP cycle and the S&OE routine so that sales, operations and finance decide on the same plan, with scenarios in numbers and named owners.
Context
In many of the companies we visit, the S&OP meeting takes place every month and no decision comes out of it. Each area brings its own number, and the plan that counts is still the budget. The cost shows up as inventory in the wrong place, expedited freight and lost sales.
We organise the process in two cadences. The monthly S&OP closes a single plan for demand, supply and financial result over the next 12 to 18 months, and takes disagreements to the executive team as scenarios valued in Brazilian reais. The weekly S&OE covers the next 4 to 13 weeks and corrects deviations while they are still cheap.
We deliver the cycle design, the forecasting and capacity models, the roles of each area and the indicators. We then run three full cycles alongside the team, because a planning process only settles once it is running.
Scope of work
Maturity assessment
Review of the current process in five dimensions (demand, supply, finance, governance and data), with the gaps ranked by their impact on results.
S&OP cycle design
Monthly calendar, agenda for each step, roles, decision rules and the pack that reaches the executive meeting.
Demand forecast and supply plan
Statistical forecasting model, consensus process with the commercial team and a production, purchasing and transport plan limited to real capacity.
S&OE routine
Weekly execution meeting with a deviation dashboard, order prioritisation rules and escalation triggers.
Indicators and three assisted cycles
Forecast accuracy, plan adherence, service level and inventory turnover, measured from the first cycle and followed for three months.
Discuss my case
Signals this applies to you
When three or more of these describe your operation, we usually find enough value to justify a diagnostic.
Discuss my case- Sales, operations and finance work with different numbers for the same month.
- High inventory and product shortages at the same time.
- Recurring expedited freight and overtime to deliver what was sold.
- An S&OP meeting that informs but does not decide.
FAQ
Frequently asked questions
What is the difference between S&OP and S&OE?
S&OP is the monthly cycle that sets the medium-term plan, from 3 to 18 months, and the decisions on capacity, inventory and mix. S&OE is the weekly routine that secures the execution of that plan over the next 4 to 13 weeks and handles day-to-day deviations. Each depends on the other. Without S&OE, the monthly plan is out of date by the second week.
Do we need a new system?
At the start, almost never. The first cycle runs on ERP data and structured spreadsheets. Once the process is stable, we specify the planning tool, if one makes sense for the size of the operation.
How soon do results appear?
Forecast accuracy and plan adherence are measured from the first cycle, and progress is visible month by month. Reductions in inventory and in expedited freight depend on the replenishment lead time of each operation and are measured against the baseline set at the start.
How does S&OP connect with logistics?
The supply plan includes transport, warehousing and port windows as constraints. As a result, freight and capacity are no longer contracted at the last minute.
Related practices
Logistics network optimization and service level
We model the network formally to answer where to produce, where to hold inventory, how to route and at what service level. The solution carries a mathematical guarantee of optimality, which a spreadsheet heuristic cannot give.
02Tax-balanced network design
We optimize the network and the tax structure inside the same model. In Brazilian interstate operations, a decision on where to hold inventory that leaves ICMS out is taken with half the information.
03Operating cost efficiency across the chain
We target the costs that accumulate outside base freight (demurrage, detention, storage, handling and accessorials), with documented recalculation and correction of the root cause.