10

Rail and port engineering

Concept design and capacity analysis for rail and port assets (spurs, terminals, yards and berths), at the stage where the investment decision is made.

For whom
Shippers, operators and investors in rail and port assets
Fee structure
Fixed fee per deliverable, with success fee on avoided capex where applicable
Typical timeline
6 to 14 weeks per study

Context

Brazil’s railway legal framework opened the construction and operation of railways to private parties under an authorisation regime. Shippers and investors can now take a decision that used to belong to the State, which is whether to build their own access.

The answer requires engineering and economics in the same analysis. Alignment, capacity, rolling stock and construction cost define technical viability. Volume, the cost of the current alternative and the contractual horizon define economic viability. A study that treats the two separately reaches conclusions that are hard to defend before an investment committee.

One specific and expensive error appears in most of the projects we review, which is sizing capacity on average demand. Queues form on variability, and for that reason we run capacity analysis by simulation.

Scope of work

01

Concept design for spur, terminal or yard

Preliminary technical design with capacity sizing, general arrangement and implementation cost estimate.

02

Capacity analysis under simulation

Effective section, yard and berth capacity assessed with real operational variability, identifying the bottleneck and the marginal gain of each intervention.

03

Investment alternatives assessment

Build, expand, lease or contract compared, with total cost and risk attached to each option.

04

Technical support for authorisation

Technical preparation of applications under the railway framework, with the elements the agency requires.

Discuss my case

Signals this applies to you

When three or more of these describe your operation, we usually find enough value to justify a diagnostic.

Discuss my case
  • Assessment of a dedicated spur or terminal as an alternative to contracted third-party capacity.
  • An investment decision with sizing uncertainty.
  • A capacity bottleneck whose cause has not been identified.
  • Interest in applying for a railway authorisation under the new framework.

FAQ

Frequently asked questions

What changed with the railway legal framework?

Law 14,273/2021 created an authorisation regime allowing private parties to build and operate railways by application, without a public tender. That made shortline and dedicated-access projects legally viable for the first time.

Do you produce detailed design?

We work at concept, feasibility and preliminary design, which is the stage where the investment decision is made. Detailed design is developed by specialist engineering firms, with our technical oversight where the client wants it.

How is avoided capex calculated?

By comparing the investment originally planned with what is required after the capacity analysis. In our studies, the correct intervention is often smaller and cheaper than the one first conceived.

Next step

Put a number on the recoverable value in your operation

The first step is a 30-minute conversation about your corridor, your contracts and the order of magnitude involved. There is no pitch deck and no commitment.

Talk to a partner WhatsApp

Reply within one business day · contato@logconsult.com.br