Strategic transport planning and PPP structuring
Strategic transport planning and public-private partnership structuring, from the sector master plan to the economic and financial model of the contract.
Context
Logistics infrastructure is decided in two places: the plan, which defines what gets built, and the contract, which defines how well it gets built. We work on both.
On the planning side, the recurring difficulty is a plan that lists projects without ranking them by logistics return. A state transport plan with forty interventions needs quantified prioritisation, so that the order of execution follows economic return.
On the modelling side, the central issue is risk allocation. In our reading, the PPP and concession contracts that run into difficulty are usually those that assigned the private partner a risk it does not control, such as demand in an asset with no capture power, licensing timelines or expropriation. Sound modelling begins by identifying who controls each risk and allocating it to that party.
Scope of work
Territorial logistics diagnosis
Flows, bottlenecks and logistics costs mapped across the territory or sector, with the highest-return interventions identified.
Strategic plan with prioritisation
An intervention portfolio ranked by logistics and economic return, with sequencing, cost and horizon defined.
Project structuring
Scope, business model and institutional arrangement defined, with contracting alternatives assessed.
Economic and financial modelling
The PPP or concession model: cash flow, revenue structure, availability payment, guarantees and rebalancing indicators.
Risk and performance matrix
Risk allocated between parties and a performance measurement system that ties payment to outcome.
Discuss my case
Signals this applies to you
When three or more of these describe your operation, we usually find enough value to justify a diagnostic.
Discuss my case- Preparation or revision of a state, municipal or sector logistics and transport plan.
- Structuring a PPP or concession for a terminal, rail spur, waterway or access road.
- A need to prioritise an investment portfolio on technical criteria.
- Review of the performance and economic balance of an existing concession contract.
FAQ
Frequently asked questions
Do you work for the public sector?
Yes. In strategic transport planning, project structuring and PPP modelling we serve governments and agencies as well as private clients. Under our written side policy, we never act on both sides of the same project.
What differentiates your modelling?
The logistics foundation. PPP modelling is commonly led by financial and legal teams working from a demand assumption supplied by a third party. We build demand and operations inside the same model as the contract, because those are the assumptions on which a project most depends.
Do you work with multilateral lenders?
We structure studies to the traceability standard required by development banks and multilateral institutions, with documented assumptions and calculated sensitivity.
Related practices
Market studies and cargo movement potential
We establish how much cargo exists, where it comes from, where it goes and how much of it an asset can realistically capture. Every infrastructure investment decision depends on that answer.
08EVTEA: technical, economic and environmental feasibility studies
We produce the feasibility study that supports the investment decision, with engineering, demand and economic appraisal in one model and assumptions built to withstand a lender’s review.
10Rail and port engineering
Concept design and capacity analysis for rail and port assets (spurs, terminals, yards and berths), at the stage where the investment decision is made.