Market studies and cargo movement potential
We establish how much cargo exists, where it comes from, where it goes and how much of it an asset can realistically capture. Every infrastructure investment decision depends on that answer.
Context
Every logistics infrastructure project rests on a demand estimate. In our experience, projects go wrong in that estimate far more often than in engineering or in the financial model.
The macro projection (crop growth, sector GDP and trade volumes) is rarely the source of the error. The common error is in capture. The study assumes that a well-located asset will attract a share of the cargo in its catchment area and does not demonstrate why a shipper would change route. Cargo migrates on total cost, available capacity and reliability, never on proximity alone, and only when the difference exceeds the friction of switching.
Our studies start from real cargo: an origin-destination matrix rebuilt from public and field data, a catchment area delimited by cost and not by radius, and capture modelled lane by lane, comparing the door-to-door cost of the proposed alternative with what the shipper pays today.
Scope of work
Origin-destination matrix
Existing flows reconstructed by product, origin, destination, mode and seasonality from public databases and field survey.
Cost-based catchment area
Effective hinterland delimited by door-to-door total cost instead of geographic distance.
Demand projection
Scenarios for production and consumption in the catchment area, with explicit assumptions and ranges in place of point estimates.
Capture model
Realistically capturable share estimated lane by lane, comparing the proposed alternative with what the shipper pays today.
Sensitivity analysis
How capturable demand responds to variations in tariff, capacity and competitor performance.
Discuss my case
Signals this applies to you
When three or more of these describe your operation, we usually find enough value to justify a diagnostic.
Discuss my case- An investment decision on a terminal, rail spur or port asset.
- Structuring a project under authorisation, or a PPP proposal.
- A demand assumption that must survive an investment committee, a lender or a regulator.
- Assessment of an existing asset’s effective catchment area and growth potential.
FAQ
Frequently asked questions
What data sources do you use?
Public databases for foreign trade, agricultural and industrial production, port throughput and transport output, complemented by field work with shippers and operators in the region. Every figure delivered carries an identified source.
Is the study suitable for financing?
Yes. The traceability standard (explicit assumption, identified source and documented sensitivity) is built to withstand scrutiny from lenders, investment committees and oversight bodies.
How is this different from a conventional market study?
The difference is capture modelling. A conventional study sizes the market. We also size how much of it the asset can attract and demonstrate, lane by lane, why a shipper would switch.
Related practices
EVTEA: technical, economic and environmental feasibility studies
We produce the feasibility study that supports the investment decision, with engineering, demand and economic appraisal in one model and assumptions built to withstand a lender’s review.
09Strategic transport planning and PPP structuring
Strategic transport planning and public-private partnership structuring, from the sector master plan to the economic and financial model of the contract.
10Rail and port engineering
Concept design and capacity analysis for rail and port assets (spurs, terminals, yards and berths), at the stage where the investment decision is made.
Next step
Put a number on the recoverable value in your operation
The first step is a 30-minute conversation about your corridor, your contracts and the order of magnitude involved. There is no pitch deck and no commitment.